Contact US

lf you have any queries, get in touch today! Don't hesitate, We try to take the extra step forour customer satisfaction.

 

Contact Us

  • First Name *

  • Last Name *

  • Email *

  • Message

  • Submit

  • Security Code
    Refresh the code
    Cancel
    Confirm
图片展示
图片展示

Painting Case

  • Construction location: Qingdao, a pipeline factory color steel tile roof and western drying wall.
  • Customer Requirements: EQPT cooling range, reduce the use of air conditioning
  • Application: 0.2 mm THK of YT-101 nano-reflective thermal insulation coating.
  • Working conditions: ambient temp 32 ℃, wind speed 1.5 m/s, testing roof color steel tile surface temp: outdoor 51.2  ℃, indoor 37 ℃.
  • Construction Plan: high-pressure water gun to clean the surface dust of colored steel tile roof, and then spray YT-101 nano-reflective coating twice to the THK of 0.2 mm.
  • Customer Evaluation: after the construction of the roof color steel tile surface temp testing: outdoor 33.1  ℃, indoor 27.9  ℃.




Home                         About HXTC 

Production                 Application

Case                          News

Contact Us

212, Building 23, Keyuan West, No.1 Kezhi West Road, Science Park Community, Yuehai Street, Nanshan District, Shenzhen

Monday - Friday : 9.00am 5pm

13925241104

Copyright © 2005-2024 MySite Ltd. All Rights Reserved.

Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.